Back

NEPA DOCUMENTS AT PICATINNY ARSENAL

NEPA TITLEDATEAREADOCUMENT TYPENEPA DOCUMENT
Upgrade of Access Control Points at Picatinny Arsenal 3/29/2017 AAL EA - Upgrade of Access Control Points for Picatinny Arsenal.pdf
Size: 9228 KB
EA
NRC License Amendment 1/12/2017 Gorge Area - 1222 EA - NRC License (Gorge Area).pdf
Size: 213 KB
EA
Water Treatment Plant Replacement 2/3/2016 AAL Water Treatment Plant Replacement EA.pdf
Size: 13252 KB
EA
Update to Integrated Natural Resources Management Plan 2/19/2014 AAL REC - Update to Integrated Natural Resources Management Plan.pdf
Size: 63 KB
REC
Verizon Wireless Tower 1/3/2014 Tower 44 Vicinity EA - Verizon Wireless Tower - 2014 (1 of 3).pdf
Size: 2679 KB
EA
Re-Establishing and Establishing Firebreaks at Picatinny Arsenal 5/29/2013 AAL EA - Firebreaks Programmatic Assessment.pdf
Size: 677 KB
EA
Safe Armaments Facility for Energetics Research (SAFER) 12/11/2012 1200-area EA - SAFER FNSI_EA_12 11 12 (final).pdf
Size: 10824 KB
EA
Construction and Operation of Open Burning Grounds Addendum 10/24/2012 500-area EA - Open Burning Grounds Addendum.pdf
Size: 1283 KB
EA
Army Alternate Procedures for Historic Properties 10/15/2012 AAL EA - AAP Final.pdf
Size: 5192 KB
EA
Programmatic Environmental Assessment for Building Demolitions at Picatinny Arsenal 12/28/2011 AAL EA - Picatinny_PEA_FINAL, Rev. 1_MASTER.pdf
Size: 11836 KB
EA
Phase 3 Outdoor Testing by the TBRL at the Picatinny Helipad 8/31/2011 B. 3801 EA - TBRL Third Addendum.pdf
Size: 898 KB
EA
Picatinny Lake Dam and Lake Denmark Dam Safety Upgrades 8/30/2011 AAL EA - Amendment to the Picatinny Lake Dam and Lake Denmark Dam Safety Upgrades.pdf
Size: 241 KB
EA
Ballistic Evaluation Center 8/5/2011 600-area EA - Ballistic Evaluation Center.pdf
Size: 2895 KB
EA
NJDOT Route 15 Northbound/Phipps Road Interchange Improvement and Easement 7/27/2011 Phipps Road EA - Pondview.pdf
Size: 22738 KB
EA
Operation of an Outdoor Small Arms Firing Range (G-2 Area) 6/20/2011 G-2 Area EA - Supplemental EA for Operation of an Outdoor Small Arms Firing Range (G-2 Area) at Picatinny Arsenal, NJ.pdf
Size: 1053 KB
EA
TBRL Phase 2 Outdoor Behavioral Response Tests 4/20/2011 3500-area EA - TBRL Second Addendum.pdf
Size: 769 KB
EA
Frontier Performance Polymers Corporation 7/19/2010 B. 3328 EA - Frontier Performance Polymers Corporation at Building 3328.pdf
Size: 542 KB
EA
Fragment Containment Test Stand 4/22/2010 616 Test Area EA - FCTS Final EA FNSI 21APR2010.pdf
Size: 1414 KB
EA
Construction and Operation of Verizon-Sprint Wireless Communications Facility 2/16/2010 Berkshire Trail VerizonSprintCellTower.pdf
Size: 12728 KB
EA
Expansion of Organic Materials Technology Branch (OMTB) Operations from Building 318 to Building 307 11/30/2009 B. 307 EA (Final) - B. 307 Plastics Prototype Research Facility JAN 14 (edited jan26).docx
Size: 4717 KB
EA
Picatinny Lake Dam and Lake Denmark Dam Safety Upgrades 9/9/2009 AAL EA - Dam Upgrade Final.doc
Size: 24446 KB
EA
ADDENDUM TO THE CONSTRUCTION AND OPERATION OF CHILD DEVELOPMENT CENTER 2/1/2009 3100-area CDC EA Addendum.pdf
Size: 591 KB
EA
BRAC 05 Realignment at Picatinny Arsenal, NJ 1/30/2009 AAL Picatinny BRAC EA_Final2.pdf
Size: 21382 KB
EA
Real Property Master Plan Programmatic Environmental Assessment 12/19/2008 AAL EA - Master Plan PEA final draft (Final-2FEB09).pdf
Size: 2023 KB
EA
Conduct of Behavioral Response Testing and Evaluation by the Target Behavioral Response Laboratory (TBRL) 11/25/2008 3500 EA - TBRL Addendum (PEMS).doc
Size: 240 KB
EA
INSTALLATION AND OPERATION OF THE T-10 CONTAINED DETONATION CHAMBER 7/1/2008 500-area EA - Donovan Chamber - Final EA from PICA Env 07 July 08.doc
Size: 2622 KB
EA
Armament Integration Facility Addition to the Armament Technology Facility 4/1/2008 Building 7 EA - AIF.doc
Size: 223 KB
EA
Construction and Operation of Child Development Center 2/1/2008 3100-area CDC EA.pdf
Size: 908 KB
EA
Endangered Species Management Plan and Environmental Assessment for the Indiana Bat 9/28/2007 AAL EA - Indiana Bat ESMP (DEC07).doc
Size: 4199 KB
EA
Modular Shooting Equipment Building 1/15/2007 Building 63 Modular Shooting Equipment Building EA.docx
Size: 138 KB
EA
Two Company Headquarters Fire Station 1/1/2007 EA-Fire_Station.pdf
Size: 232 KB
EA
EXPLOSIVES RESEARCH AND DEVELOPMENT LOADING FACILITY 12/1/2005 200-area Explosives_RDLF_EA.doc
Size: 732 KB
EA
Construction and Operation of Burning Grounds 9/23/2005 500-area EA-Burning Grounds Draft Final.doc
Size: 576 KB
EA
Construction and Operation of an Outdoor Firing Range (G-2 Area) at Picatinny 6/24/2005 G-2 Test Area Final EA Report Outdoor Range August 2005rev Aug 26 2005.pdf
Size: 36241 KB
EA
Pyrotechnics Laboratory 3/18/2005 500-area EA Pyro rev 2.doc
Size: 3823 KB
EA
Environmental Assessment for the Bog Turtle, Clemmys muhlenbergii, Endangered Species Management Plan 11/30/2004 AAL EA - BogTurtle ESMP Final draft (6DEC04).doc
Size: 2031 KB
EA
High Energy Propellant Formulation Facility (HEPFF) 6/17/2004 1300-area EA - High Energy Propellant Formulation Facility (HEPFF).pdf
Size: 1040 KB
EA
Soft Recovery Systems 3/1/2004 640 Test Area SoftRecoverySystem(SCAT640).pdf
Size: 2488 KB
EA
Construction of an Automated Energetics Processing Facility 2/27/2004 200-area EA - Construction of an Automated Energetics Processing Facility, B. 237.pdf
Size: 2778 KB
EA
Historically Significant Depleted Uranium Testing Facility 7/1/2003 EA - B. 611B Decommisioning.pdf
Size: 7025 KB
EA
CONSTRUCTION OF A HOMELAND DEFENSE TECHNOLOGIES AND SECURITY READINESS CENTER 5/1/2003 3500 B3500.doc
Size: 413 KB
EA
Arsenal-Wide Heating System Improvements 2/28/2003 AAL EA - Heating System Improvements for PEMS.doc
Size: 356 KB
EA
INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN 5/1/2001 AAL INRMPEA.pdf
Size: 3371 KB
EA
IMPLEMENTATION OF THE INTEGRATED CULTURAL RESOURCES MANAGEMENT PLAN FOR PICATINNY ARSENAL 4/1/2001 AAL ICRMPEA.pdf
Size: 3113 KB
EA
PROPOSED MOVING OF FLAMMABLE HAZARDOUS WASTE STORAGE TO A CENTRAL HAZARDOUS WASTE STORAGE AREA 2/1/2000 3100 HazardousWasteStorageEA.pdf
Size: 7174 KB
EA
PICATINNY ARSENAL AQUATIC CENTER 6/1/1999 3100 Area AquaticParkEA.docx
Size: 57 KB
EA