Technical Assistance Public Participation



The Technical Assistance Public Participation Contractor "SubSurface Solutions" was on board from 2004 through October of 2014. The following incudes the newsletters and briefings from that effort that was developed by the contractor and shared with the Picatinny RAB.


Newsletters Technical Briefings
   
  Winter 2011 120210 Skeet Range RI
  Spring 2011 120222 Proposed Plan Mid-Valley Groundwater for Distribution
Winter 2009 120507 Annual Monitoring Report Group 1 Sites
  Spring 2009 120507 EPA Response on LUCs
Summer 2008 120507 Group 1 Annual Report Summary Table
Spring 2007 120612 Lakes FS
Fall 2007 120625 Area C Semiannual Groundwater Report
  Winter 2007 120625 NFA PP Final
December 2004 120816 Group 3 Monitoring Report
  September 2004 120917 Annual Monitoring Report
July 2004 1302010 Draft remedial Design Mid-Valley Groundwater
    130228 GPB-BSB (Pica 193) 2011 Annual SW & Sed Mon Rpt FNL
    130228 USEPA Response on LUCs-ARAR Issue FNL
    130610 600 Acre Data Report and FS
    130720 Area B Annual Report
    130720 Group 3 Site (PICA 08) Annual Report
    130720 Site 78 Annual Report
    130918 2012 Annual report GPB &BSB (PICA 193)
    131019 Mid-Valley Remedial Action Report
    131023 Area C Semisnnusl Report
    140203 RD WP Site34 Lower Burning Road
140211 MMRP Table 1
    140211 RD MMRP RI Report
    140211 Table 2 MMRP
140401 Site 23 Poat Farm Landfill Annual Monitoring Report
    140422 300 Marsh Area Letter Report Briefing
    140502 Area E Annual Monitoring Report
    140511 3 Site FS
140610 Area D (PICA-076) Annual Monitoring Report
    140707 Group 1 Sites Annual Monitoring Report
140717 Area C Long-Term Monitoring Report
140729 2013 Annual report GPB & BSB (PICA 193)
140910 Lakes FS
    141117 Area C Long-Term Monitoring Report